掌握互斥项目的NPV和IRR计算方法,理解投资决策逻辑
东辰机械制造有限公司计划更新生产线,有 C、D 两个互斥方案可供选择,相关数据如下(基准折现率为 10%):
净现值(NPV):
NPVC = 60 × (P/A, 10%, 5) - 200
= 60 × 3.7908 - 200
= 227.45 - 200
= 27.45 万元
内含收益率(IRR):
令 60 × (P/A, IRR, 5) = 200,得 (P/A, IRR, 5) = 3.3333
查表得:(P/A, 15%, 5) = 3.3522,(P/A, 16%, 5) = 3.2743
使用插值法计算:
IRRC = 15% + (16% - 15%) × (3.3522 - 3.3333)/(3.3522 - 3.2743)
= 15% + 1% × 0.0189/0.0779
= 15% + 0.2426%
≈ 15.24%
净现值(NPV):
NPVD = 50×(P/F,10%,1) + 80×(P/F,10%,2) + 100×(P/F,10%,3) + 120×(P/F,10%,4) + 150×(P/F,10%,5) - 300
= 50×0.9091 + 80×0.8264 + 100×0.7513 + 120×0.6830 + 150×0.6209 - 300
= 45.455 + 66.112 + 75.130 + 81.960 + 93.135 - 300
= 361.792 - 300
= 61.79 万元
内含收益率(IRR):
试算折现率 14% 时:
NPV = 50×0.8772 + 80×0.7695 + 100×0.6750 + 120×0.5921 + 150×0.5194 - 300 ≈ 18.32 万元
试算折现率 16% 时:
NPV = 50×0.8621 + 80×0.7432 + 100×0.6407 + 120×0.5523 + 150×0.4761 - 300 ≈ -5.28 万元
使用插值法计算:
IRRD = 14% + (16% - 14%) × 18.32/(18.32 + 5.28)
= 14% + 2% × 18.32/23.60
= 14% + 1.55%
≈ 15.55%
项目 | NPV (万元) | IRR (%) |
---|---|---|
项目 C | 27.45 | 15.24 |
项目 D | 61.79 | 15.55 |
NPVD (61.79万元) > NPVC (27.45万元)
IRRD (15.55%) > IRRC (15.24%)
在本例中,NPV 与 IRR 的决策结论一致(都支持选择项目D),但假设存在冲突情况:
假设情景:如果项目 D 的 IRR 略低于项目 C(例如 IRRD = 14.8%,IRRC = 15.2%),但 NPVD 仍然高于 NPVC
决策结论:仍然选择项目 D
理由:
互斥项目决策中,净现值(NPV)是核心指标。项目 D 的 NPV 更大,意味着能为企业创造更多价值,与"企业价值最大化"目标一致。即使 IRR 存在差异,NPV 的绝对价值贡献更能反映项目的实际价值,因此应优先选择 NPV 更大的项目。
互斥项目的本质是"二选一",决策的关键是选择价值增量最大的项目。净现值(NPV)直接衡量价值增量,而内含收益率(IRR)可能因项目规模、现金流量模式差异导致误导。因此,无论是否存在指标冲突,NPV 都是互斥项目决策的最终依据(寿命期相同情况下)。
东辰机械制造有限公司应选择项目 D(智能生产线),因为: